Larsen & Toubro Limited
₹3,837.10+₹35.80 (+0.94%)
Larsen & Toubro Limited’s quoted price sits in the lower half of its reported 52-week range, 13.58% below the high.
NSE · KEC.NS · INR
Stock price, dividends, earnings
Quote as of Oct 29, 2026, 10:00 AM UTC. Cached market data; not a live quote.
One-year closing-price history · INR. Historical prices are not a forecast.
KEC International Limited’s quoted price sits in the lower half of its reported 52-week range, 58.67% below the high.
52-week range
Go beyond this overview with deeper company research in PortfolioX. Explore more in the app
THE INCOME SIDE
KEC International Limited’s forward annual dividend is ₹5.50 per share, paid annual. The forward yield is 1.6% at the quoted price. Future payments can change.
Historical amounts are adjusted for stock splits. Understand ex-dividend and payment dates →
BEHIND THE RESULTS
KEC International Limited’s next earnings report is currently expected on Nov 2, 2026, with estimated earnings per share of ₹4.45. The reporting date and estimates may change.
Upcoming dates and analyst estimates may change. Fiscal quarters follow KEC International Limited’s reporting calendar.
THE COMPANY BEHIND THE TICKER
KEC International Limited, an Indian firm established in Mumbai in 1945, operates as a global engineering, procurement, and construction (EPC) specialist. The company provides complete, end-to-end solutions for power transmission lines, covering design, manufacturing, testing, supply, and installation. Its extensive EPC project portfolio includes high-voltage electrical substations, distribution networks, fiber optic infrastructure, and telecommunication towers, alongside high and extra-high voltage cabling assignments. Beyond infrastructure build-out, KEC also manufactures a range of cables, including power, jelly-filled telecommunication, and optical fiber cables. The company is a key contributor to railway infrastructure, offering comprehensive EPC services for bridges (including road overpasses), tunnels, stations, and platforms. This expertise extends to track laying, earthworks, overhead electrification, traction substations, and the provision and installation of signaling and telecommunication systems. Furthermore, KEC undertakes various civil construction projects, such as factories, warehouses, residential complexes, commercial buildings, and water/sewage treatment facilities, actively engaging in smart infrastructure initiatives. Its services also encompass full-spectrum solar EPC, from design and engineering to project execution, management, bid support, and feasibility assessments for photovoltaic power plants. KEC maintains a substantial international footprint, operating across 110 countries, with a presence in regions like India, Brazil, Mexico, and the United States.
Latest available per-share figures in INR. The payout ratio compares dividends with earnings.
About this data · PortfolioX market data, also available in the mobile app. Prices are displayed in the listing currency; dividend amounts use the currency shown in that section. Data availability and update times vary.
Page generated Oct 29, 2026, 10:57 PM UTC. Quotes retain their own timestamp above. Missing values appear as a dash. This page is for information only, not personalized investment advice.
Completed calendar years and any current-year payments shown separately. Current-year totals are incomplete until all payments are made.
See annual income at the current dividend rate.
Assumes the annual dividend stays unchanged. Payments follow the company’s schedule. Excludes taxes, fees and currency changes.
| Q4 2025 | May 26, 2025 | ₹10.09-3.35% vs estimate | ₹68.67B-2.83% vs estimate |
|---|
| Q3 2025 | Feb 3, 2025 | ₹4.90-28.99% vs estimate | ₹53.49B-3.6% vs estimate |
|---|
| Q2 2025 | Nov 4, 2024 | ₹3.32-33.2% vs estimate | ₹51.13B+0.41% vs estimate |
|---|
HOW THE BUSINESS IS PERFORMING
Statement amounts use the company’s reporting currency and are not converted to the stock’s listing currency. K = thousand, M = million, B = billion, T = trillion. Cash-flow figures are matched by fiscal year; missing figures appear as a dash.
PUT THE NUMBERS IN CONTEXT
Current metrics alongside available historical medians. A lower multiple or higher margin alone does not establish whether a stock is a good investment.
KEEP COMPARING
₹3,837.10+₹35.80 (+0.94%)
Larsen & Toubro Limited’s quoted price sits in the lower half of its reported 52-week range, 13.58% below the high.
₹3,830.80-₹25.20 (-0.65%)
KEI Industries Limited’s quoted price sits in the lower half of its reported 52-week range, 35.06% below the high.
₹1,357.10+₹32.40 (+2.45%)
Kalpataru Projects International Limited’s quoted price sits in the upper half of its reported 52-week range, 8.92% below the high.
₹850.00-₹0.30 (-0.04%)
Techno Electric & Engineering Company Limited’s quoted price sits in the lower half of its reported 52-week range, 38.58% below the high.
₹435.75+₹6.50 (+1.51%)
Transrail Lighting Limited’s quoted price sits in the lower half of its reported 52-week range, 41.16% below the high.
₹2,751.30+₹50.40 (+1.87%)
Vindhya Telelinks Limited’s quoted price sits in the upper half of its reported 52-week range, 8.26% below the high.
₹163.11+₹1.91 (+1.18%)
Bajel Projects Limited’s quoted price sits in the lower half of its reported 52-week range, 24.31% below the high.
₹10.08-₹0.23 (-2.23%)
Jyoti Structures Limited’s quoted price sits in the lower half of its reported 52-week range, 53.72% below the high.