Dilip Buildcon Limited
₹378.75-₹7.15 (-1.85%)
Dilip Buildcon Limited’s quoted price sits in the lower half of its reported 52-week range, 28.3% below the high.
NSE · GRINFRA.NS · INR
Stock price, dividends, earnings
Quote as of Oct 29, 2026, 09:59 AM UTC. Cached market data; not a live quote.
One-year closing-price history · INR. Historical prices are not a forecast.
G R Infraprojects Limited’s quoted price sits in the lower half of its reported 52-week range, 35.25% below the high.
52-week range
Go beyond this overview with deeper company research in PortfolioX. Explore more in the app
THE INCOME SIDE
G R Infraprojects Limited’s forward annual dividend is ₹2.50 per share, paid annual. The forward yield is 0.32% at the quoted price. Future payments can change.
Historical amounts are adjusted for stock splits. Understand ex-dividend and payment dates →
Completed calendar years and any current-year payments shown separately. Current-year totals are incomplete until all payments are made.
See annual income at the current dividend rate.
Assumes the annual dividend stays unchanged. Payments follow the company’s schedule. Excludes taxes, fees and currency changes.
BEHIND THE RESULTS
G R Infraprojects Limited’s next earnings report is currently expected on Nov 5, 2026, with estimated earnings per share of ₹14.18. The reporting date and estimates may change.
Upcoming dates and analyst estimates may change. Fiscal quarters follow G R Infraprojects Limited’s reporting calendar.
THE COMPANY BEHIND THE TICKER
G R Infraprojects Limited, along with its subsidiaries, delivers comprehensive engineering, procurement, and construction (EPC) solutions, predominantly for road and highway developments. Their operations extend across India and to international markets. The company structures its business across three main segments: Engineering Procurement and Construction, Built, Operate and Transfer (BOT) Projects, and various other related services. Their construction capabilities cover a wide array of infrastructure, including major national and state highways, numerous types of bridges, culverts, flyovers, airport runways, tunnels, and rail over bridges. Additionally, the company provides complete turnkey solutions for railway infrastructure. This includes civil engineering components such as earthworks, bridges, and station buildings; the installation of new tracks and refurbishment of existing lines; the deployment of railway electrification and power systems; and the provision of signaling and telecommunication services. Beyond transportation infrastructure, G R Infraprojects undertakes the design, engineering, procurement, fabrication, erection, installation, and commissioning of power transmission lines. The company also possesses manufacturing capabilities, producing thermoplastic road-marking paints and road signage. Furthermore, they fabricate and galvanize metal crash barriers and process bitumen. Founded in 1995, the company operated as G.R. Agarwal Builders and Developers Limited until its rebranding to G R Infraprojects Limited in August 2007. Its corporate headquarters are located in Udaipur, India.
Latest available per-share figures in INR. The payout ratio compares dividends with earnings.
About this data · PortfolioX market data, also available in the mobile app. Prices are displayed in the listing currency; dividend amounts use the currency shown in that section. Data availability and update times vary.
Page generated Oct 30, 2026, 12:40 AM UTC. Quotes retain their own timestamp above. Missing values appear as a dash. This page is for information only, not personalized investment advice.
| Q4 2025 | May 15, 2025 | ₹35.10+54.63% vs estimate | ₹19.90B-4.37% vs estimate |
|---|
| Q3 2025 | Feb 1, 2025 | ₹17.40+11.97% vs estimate | ₹15.01B-10.28% vs estimate |
|---|
| Q2 2025 | Nov 7, 2024 | ₹10.27-35.65% vs estimate | ₹11.28B-31.59% vs estimate |
|---|
HOW THE BUSINESS IS PERFORMING
Statement amounts use the company’s reporting currency and are not converted to the stock’s listing currency. K = thousand, M = million, B = billion, T = trillion. Cash-flow figures are matched by fiscal year; missing figures appear as a dash.
PUT THE NUMBERS IN CONTEXT
Current metrics alongside available historical medians. A lower multiple or higher margin alone does not establish whether a stock is a good investment.
KEEP COMPARING
₹378.75-₹7.15 (-1.85%)
Dilip Buildcon Limited’s quoted price sits in the lower half of its reported 52-week range, 28.3% below the high.
₹133.98-₹1.02 (-0.76%)
PNC Infratech Limited’s quoted price sits in the lower half of its reported 52-week range, 54.03% below the high.
₹411.05+₹1.75 (+0.43%)
J. Kumar Infraprojects Limited’s quoted price sits in the lower half of its reported 52-week range, 38.83% below the high.
₹100.73-₹0.48 (-0.47%)
KNR Constructions Limited’s quoted price sits in the lower half of its reported 52-week range, 46.4% below the high.
₹98.97+₹2.75 (+2.86%)
Ashoka Buildcon Limited’s quoted price sits in the lower half of its reported 52-week range, 53.86% below the high.
₹387.30+₹6.95 (+1.83%)
H.G. Infra Engineering Limited’s quoted price sits in the lower half of its reported 52-week range, 58.89% below the high.
₹113.23+₹1.09 (+0.97%)
GPT Infraprojects Limited’s quoted price sits in the lower half of its reported 52-week range, 24.51% below the high.
₹20.11+₹0.95 (+4.96%)
MBL Infrastructures Limited’s quoted price sits in the lower half of its reported 52-week range, 53.12% below the high.